Planning


A plan board with movable cards.
Twelve work scenes for presentations
Choose a scene and compare two existing head and hairstyle appearances in the same composition.
Compare all 12 scenesA has short hair. B has tied hair.
The body, clothing, skin tone and pose stay the same.

Planning · A — short hair. The scene stays fixed when you switch appearances.
Back to Planning in galleryThe collection
Each pair uses the same composition.
In scenes with two people, the person in teal changes appearance.


A plan board with movable cards.


A seated person working at a desk.


Two people exchanging ideas at a table.


A document examined through a magnifying glass.


A parcel passed between two people.


Comments and completed review items.


A chosen calendar date beside a clock.


A diagram explained beside a lectern.


A puzzle piece beside its matching board.


Three steps leading toward a milestone.


An open book and a quiet reading space.


Raised arms beside a trophy.
In a presentation
One planning scene placed alongside slide text.
This is an example layout, not a customer result.

Twelve work scenes, each with two primary head and hairstyle appearances. A has short hair; B has tied hair and small head accessories.
Body shape, skin tone, clothes, pose and props are shared. The second person in the meeting and handoff scenes stays the same.
AI-authored original vector artwork, created as editable geometric shapes. The images on this page are smaller, flattened previews with a visible mark.
This page offers no purchasing, original SVG/PNG/ZIP downloads, customization or usage license. Preview images can be saved by a browser; viewing does not grant a usage license.
ASUMITO
Prepared October 2026
Ownership contact
asumito.office@gmail.com
No upload, sign-up form, checkout or visitor tracking is built into this portfolio.